Before
The foundation was starting to begin to crack and separate.
Before
The foundation was starting to begin to crack and separate.
Installation
First, soil is removed from the area where the helical pier will be installed.
Installation
First, soil is removed from the area where the helical pier will be installed.
Helical Pier
Once proper depths and capacities are achieved, heavy duty steel foundation brackets are positioned below and against the foundation footing. The weight of the home is then transferred through the helical piers to deep, competent soils. Lifting the home back towards its original position is attempted.
After
The cracks are sealed, and the soil is replaced. The soil needs time to naturally settle back the way it was, so expect a bit of a pile.
After
The cracks are sealed, and the soil is replaced. The soil needs time to naturally settle back the way it was, so expect a bit of a pile.